Skip to main content
NTMWD Logo
File #: 25-6196    Version: 1
Type: Administrative Memorandum Status: Agenda Ready
File created: 10/10/2025 In control: Board of Directors
On agenda: 10/23/2025 Final action:
Title: Texoma Raw Water Pipeline No. 2 and Texoma Raw Water Pipeline to Leonard Water Treatment Plant (WTP) Pipeline; Owner Advisor Services Agreement; Project No. 101-0633-23 and No. 101-0642-24
Indexes: .RWS - Regional Water System, Construction Management Services Agreement
Code sections: 101-0633-23 - Texoma Raw Water Pipeline No 2 , 101-0642-24 - Texoma Raw Water Pipeline to Leonard WTP Pipeline
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Regional Water System

 

title

Texoma Raw Water Pipeline No. 2 and Texoma Raw Water Pipeline to Leonard Water Treatment Plant (WTP) Pipeline; Owner Advisor Services Agreement; Project No. 101-0633-23 and No. 101-0642-24

 

end

SUBJECT

 

recommendation

Authorize funding in the amount of $946,448 to Plummer Associates, Inc., for the owner advisor services agreement for the Texoma Raw Water Pipeline No. 2 and Texoma Raw Water Pipeline to Leonard Water Treatment Plant (WTP) Pipeline project.

 

end

PURPOSE

 

Retain an Owner Advisor firm with expertise to provide technical, procurement, and management services for large diameter pipeline projects. An Owner Advisor will provide value to NTMWD by serving as the owner’s representative and advisor, and augment NTMWD staff to more efficiently manage the delivery of the two pipeline projects through a single CMAR contract.

 

RECOMMENDATION

 

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an owner advisor agreement as follows:

 

Consultant:

Plummer Associates, Inc. 

 

 

Scope: 

Owner Advisor Services

 

 

Project:

No. 101-0633-23 Texoma Raw Water Pipeline No. 2, and  No. 101-0642-24 Texoma Raw Water Pipeline to Leonard WTP Pipeline

 

 

Amount:

$946,448

 

 

Committee:

This will be an item on the October 22, 2025, Water Committee meeting agenda

 

 

 

 

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

1.1 High Quality Services                                                                                              1.4 Reliable and Resilient System Capacity

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

BACKGROUND

 

The use of the Construction Manager At-Risk (CMAR) project delivery method has been selected and authorized for the Texoma Raw Water Pipeline No. 2 and Texoma Raw Water Pipeline to Leonard WTP Pipeline as a single construction contract.  An Owner’s Advisor (OA) was selected for this CMAR project due to its large scale and the limited size of NTMWD’s staff. The OA will provide the additional expertise needed to effectively manage the CMAR process, including design review, cost evaluation, and coordination between the Owner, Engineer, and Construction Manager. NTMWD will rely on the OA to facilitate communication, track progress, and ensure the CMAR team’s work aligns with project goals. This collaboration helps maintain quality, costs, and keeps the project on schedule while allowing NTMWD to make informed decisions throughout each phase.

 

PROJECT PURPOSE

 

The Texoma Raw Water Pipeline No. 2 increases the capacity of raw water transfer from Lake Texoma to the NTMWD treatment facilities. To meet projected future demand, a new parallel 84-inch transmission line from Lake Texoma to the Howe Balancing Reservoir is needed by 2029. With the existing 72-inch line, the proposed 84-inch parallel line, and a separate Texoma Pump Station Improvements project, the District will have the ability to deliver up to 220 million gallons per day (MGD) of raw water from Lake Texoma of which 120 MGD would be conveyed to the Wylie WTP complex, 70 MGD diverted to the Leonard WTP, and approximately 30 MGD delivered the City of Sherman.

 

To increase the utilization of raw water rights, water from Lake Texoma will be blended with raw water from Bois d’Arc Lake at the Leonard Water Treatment Plant Facility. This additional supply will fully utilize the planned future treatment plant capacity of 280 MGD. Texoma to Leonard Raw Water Pipeline will also be an 84-inch gravity line connecting to the existing Texoma Raw Water Pipeline south of Howe Reservoir to convey water to Leonard Terminal Storage Reservoirs.

 

OA SERVICES TO BE FUNDED THROUGH THIS AUTHORIZATION

                     Pre-Construction basic services including:

o                     Facilitate project meetings with CMAR and Engineers

o                     Provide a monthly executive report on the status of the program

o                     Monitor, review, and report to Owner on the CMAR Services, and on Engineer’s progress with its design services; make recommendations to Owner regarding management of such services

o                     Plan, schedule, conduct, and document Project meetings

o                     Review of the following submittals:

§                     Design deliverables

§                     CMAR’s construction management plan

o                     Maintain a Stakeholder Registry and Management Plan

                     Future awards to the OA firm will be presented to the Board for additional services related to construction activities by the CMAR.

 

OA SERVICES AND FEES (CURRENT REQUEST)

 

Description                     Amount

Preconstruction Basic Services                     $946,448

Texoma Raw Water Pipeline No. 2 (PN633)                     $709,836

Texoma Raw Water Pipeline to Leonard WTP

Pipeline (PN642)                     $236,612

Requested Amount                     $946,448

 

FUNDING

 

Funding in the amount of $946,448 to Plummer Associates Inc is to be made available from the Regional Water System Capital Improvement Fund.