Title: Tickey Creek Force Main; Project No. 501-0637-24; Tickey Creek Lift Station; Project No. 501-0638-24; Engineering Services Agreement, Final Engineering
Indexes: Engineering Services Agreement - Final Engineering
Code sections: 501-0637-24 - Tickey Creek Force Main, 501-0638-24 - Tickey Creek Lift Station
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Upper East Fork Interceptor System

 

title

Tickey Creek Force Main; Project No. 501-0637-24; Tickey Creek Lift Station; Project No. 501-0638-24; Engineering Services Agreement, Final Engineering

end

 

SUBJECT

 

recommendation

Authorize funding in the amount of $7,038,900 to AECOM Technical Services, Inc. for an engineering services agreement for final design of the Tickey Creek Force Main and Tickey Creek Lift Station projects.

end

 

PURPOSE

 

The purpose of this project is to increase wastewater conveyance capacity serving growth in Princeton.

 

RECOMMENDATION

 

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:

 

Consultant:

AECOM Technical Services, Inc.

 

 

Scope:

Final Engineering Design

 

 

Project:

No. 501-0637-24, Tickey Creek Force Main                                                                                                   No. 501-0638-24, Tickey Creek Lift Station

 

 

Amount:

$3,537,800.00, Tickey Creek Force Main                                                                                               $3,501,100.00, Tickey Creek Lift Station

 

 

Committee:

This will be an item on the December 17, 2025, Wastewater Committee meeting agenda

 

 

 

 

 

 

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

1.2: Successfully Deliver Capital Program                                                                                             1.4: Reliable and Resilient Systems

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

BACKGROUND

 

PROJECT PURPOSE

 

                     The Upper East Fork Interceptor System (UEFIS) Regional Capacity Assurance Phase 3 Report, dated November 1, 2023, recommended increased wastewater conveyance to meet the accelerated growth and increased flow projections serving Princeton.

                     The Capacity Assurance recommended redirecting most of Princeton’s future flows to the Sister Grove Regional Water Resource Recovery Facility (RWRRF) for treatment through a combination of new lift stations and force mains.

                     The preliminary design report recommends a 40 MGD lift station, expandable to 80 MGD, with a single 42-inch pipeline, a future lift station expansion to 80 MGD with a second parallel force main, and a future 4.9 MG peak flow storage tank.

                     The planning level estimated cost for the Tickey Creek Force Main is $61,000,000.

                     The planning level estimated cost for the Tickey Creek Lift Station is $78,000,000.

 

PROJECT COMPONENTS

 

Tickey Creek Force Main

                     Approximately 42,000 linear feet (LF) of a single 42-inch pipeline from the new Tickey Creek Lift Station to Sister Grove RWRRF.

                     Approximately 42,000 LF of fiber optic line to provide communication between the Tickey Creek Lift Station and the Sister Grove RWRRF.

 

Tickey Creek Lift Station

                     New 40 MGD lift station, expandable to 80 MGD, with odor control system

                     Flow diversion structures and discharge meter vault

                     Floodplain mitigation and site development

                     Replacement of the existing roof at the current Princeton Lift Station

                     Demolition and closure of the original (decommissioned) Princeton Lift Station

 

 

 

BASIC SERVICES

                     Project management, coordination and design review workshops

                     Hydraulic modeling, physical modeling and floodplain study

                     Final engineering design services for the lift station and force main

                     Bid phase services

 

SPECIAL SERVICES

                     Topographic and tree survey

                     Subsurface utility engineering

                     Geotechnical engineering

                     Federal Emergency Management Agency (FEMA) map revision

                     Radio path study

                     Additional environmental evaluation

 

ENGINEERING SERVICES FEE

 

Tickey Creek Force Main

Description                                                                                    Amount

Basic Services                                                               $2,715,100

Special Services                                                               $822,700

Requested Amount                                          $3,537,800

 

 

Tickey Creek Lift Station                     

Description                     Amount

Basic Services                     $3,356,100

Special Services                     $145,000

Requested Amount                     $3,501,100

                     

Total Requested Amount                     $7,038,900

 

FUNDING

 

Funding in the amount of $7,038,900 to AECOM Technical Services, Inc. is to be made available utilizing the Upper East Fork Interceptor System Construction Funds.