Regional Water System
title
Leonard Treated Water Pipeline to Farmersville
Delivery Point; Project No. 101-0632-23;
Engineering Services Agreement Final Engineering
end
SUBJECT
recommendation
Authorize an engineering services agreement (ESA) to HDR Engineering, Inc. in the amount of $5,199,428 for final engineering design for the Leonard Treated Water Pipeline to Farmersville Delivery Point project.
end
PURPOSE
The projected growth in NTMWD’s East Water Transmission System will surpass the available capacity to that system from the Wylie Water Treatment Plant (WTP) within a few years. This project will supplement the needs of the East System from the new Leonard WTP through the year 2050.
RECOMMENDATION
The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute additional engineering as follows:
|
Consultant: |
HDR Engineering, Inc. |
|
|
|
|
Scope: |
Final Engineering Design, Real Estate Services |
|
|
|
|
Project: |
No. 101-0632-23, Leonard Treated Water Pipeline to Farmersville Delivery Point |
|
|
|
|
Amount: |
$5,199,428 |
|
|
|
|
Committee: |
This will be an item on the November 20, 2024, Water Committee Agenda. |
DRIVER(S) FOR THIS PROJECT
|
Strategic Objective: |
Objective 1.1 - High Quality Services Objective 1.4 - Reliable and Resilient Systems |
|
☐ Regulatory Compliance |
☐ Asset Condition |
|
☒ Capacity |
☒ Redundancy/Resiliency |
|
☐ Relocation or External Requests |
☐ Operational Efficiency |
|
☐ Safety |
☐ Administrative |
|
☐ Policy |
☐ Other _____________ |
BACKGROUND
This project is to provide a 48-inch diameter treated water pipeline to convey water from the existing Leonard treated water pipeline in the vicinity of Farm-to-Market Road 981 south to the existing Farmersville delivery point. The alignment selected during the initial phase of design is approximately 11.5 miles long. This scope is a continuation of the project design stage, advancing from 30% Preliminary design to the completion of bid documents and procurement of the project.
PROJECT PURPOSE
• The proposed 48-inch pipeline will provide additional capacity to the East System to meet projected demands through the year 2050.
• This project was identified in Project No. 101-0588-21, the Water Transmission System CIP Update.
• The Opinion of Probable Construction Cost is $65,000,000.
PROJECT COMPONENTS
• This project includes the design of approximately 61,000 linear feet of 48-inch pipeline from a new branch connection on the existing 84-inch Leonard pipeline to a tie-in location near Farmersville Delivery Point No. 1.
• The proposed project alignment crosses numerous streets, highways, and creeks. Most of the proposed alignment would be performed by open cut, with multiple short sections of jack and bore.
• Consultant services include Right-of-Way (ROW) services for right of entry to all parcels and final land acquisition of all parcels.
ADDITIONAL SERVICES
• Final Engineering Design to develop the 100% design set and provide Bid Phase support.
• Special Services as needed to support the design development, including:
o Real Estate Consultant Services
o Environmental / Cultural Resources / Archeological Services
o Geotechnical Services
o Survey Services
o Corrosion Services
o Subsurface utility investigation at potential critical conflict locations

FUNDING
Funding to HDR Engineering, Inc. in the amount of $5,199,428 is to be made available in the Regional Water System Capital Improvement Fund.