File #: 25-6151    Version: 1
Type: Administrative Memorandum Status: Agenda Ready
File created: 6/9/2025 In control: Board of Directors
On agenda: 6/26/2025 Final action:
Title: McKinney Prosper Sewer Improvements; Project No. 501-0641-24; Engineering Services Agreement, Final Engineering
Sponsors: Wastewater Committee - Committee Discussion
Indexes: .UEFIS - Upper East Fork Interceptor System, Engineering Services Agreement - Final Engineering
Code sections: 501-0641-24 - McKinney Prosper Sewer Improvements
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Upper East Fork Interceptor System

 

title

McKinney Prosper Sewer Improvements; Project No. 501-0641-24; Engineering Services Agreement, Final Engineering

end

 

 

SUBJECT

 

recommendation

Authorize funding in the amount of $612,000 to Garver, LLC for an engineering services agreement for final design of the McKinney Prosper Sewer Improvements project.

end

 

 

PURPOSE

 

Improve the performance, capacity, and reliability of the McKinney Prosper Sewer system by adding a parallel pipeline to help convey future flows from the City of McKinney to the planned Stover Creek Lift Station.

 

 

RECOMMENDATION

 

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:

 

Consultant:

Garver, LLC

 

 

Scope:

Final Engineering Design

 

 

Project:

No. 501-0641-24, McKinney Prosper Sewer Improvements

 

 

Amount:

$612,000

 

 

Committee:

This will be an item on the June 25, 2025, Wastewater Committee meeting agenda

 

 

 

 

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

1.1 Successfully Deliver Capital Program                                                                                              1.4 Reliable and Resilient Systems

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

BACKGROUND

 

PROJECT PURPOSE

                     The Upper East Fork Interceptor System (UEFIS) Regional Capacity Assessment and Assurance study identified the need for increased capacity of the McKinney Prosper Sewer, serving the cities of McKinney and Prosper. The City of McKinney has plans to redirect flow from their Stonebridge Lift Station to NTMWD’s McKinney Prosper Sewer.

                     This project will provide the capacity needed for accommodating the system flow projections from the Stonebridge areas of north of US Highway 380 (US 380).

                     A future extension will provide additional capacity as the City of  Prosper's flow increases. This will be a separate project.

                     The preliminary design report recommends a parallel 42-/48-inch interceptor to meet both the City of McKinney and the City of Prosper’s future flow projections and convey flow to the planned Stover Creek Lift Station.

                     The planning level estimated construction cost is $8,052,000.

 

PROJECT COMPONENTS (Phase I)

                     Approximately 5,000 linear feet (LF) of parallel 42/48-inch gravity interceptor generally located from Easley Drive to the future Stover Creek junction structure near the intersection of US 380 and Ridge Road

                     Interconnections between the two pipelines at the existing McKinney Prosper Sewer manholes

                     Connection of the parallel pipe to the future junction structure being constructed under the Stover Creek Lift Station project, NTMWD Project No. 501-0625-23.

 

BASIC SERVICES

                     Project management, coordination, and design review workshops

                     Final engineering design services

                     Bid phase services

 

 

 

 

 

 

 

SPECIAL SERVICES

                     Topographic survey

                     Easement document preparation

                     Geotechnical engineering

                     Subsurface utility engineering

 

 

ENGINEERING SERVICES FEE

 

Description

Amount

Basic Services

$502,900

Special Services

$109,100

Requested Amount

$612,000

 

FUNDING

 

Funding in the amount of $612,000 to Garver, LLC is to be made available utilizing the Upper East Fork Interceptor System Extendable Commercial Paper (ECP) Program as the appropriation source; issuance of ECP notes will occur as cash needs arise.