Title: Interlocal Cooperation Agreement between the North Texas Municipal Water District and the City of Farmersville regarding modifications to NTMWD's 48-inch Leonard Treated Water Pipeline to Farmersville Delivery Point Waterline; Project No. 101-0632-23; Resolution No. 26-21
Indexes: Interlocal Agreement
Code sections: 101-0632-23 - Leonard Treated Water Pipeline to Farmersville
Attachments: 1. Resolution, 2. Interlocal Agreement, 3. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Regional Water System

 

title

Interlocal Cooperation Agreement between the North Texas Municipal Water District and the City of Farmersville regarding modifications to NTMWD’s 48-inch Leonard Treated Water Pipeline to Farmersville Delivery Point Waterline; Project No. 101-0632-23; Resolution No. 26-21

end

 

SUBJECT

 

recommendation

Adopt Resolution No. 26-21 authorizing the execution of an Interlocal Cooperation Agreement (ILA) between the North Texas Municipal Water District and the City of Farmersville (City) to authorize the City’s contractor to install 100 linear feet (LF) of 68-inch steel casing across Farmersville Parkway in exchange for a stub-out and valves on NTMWD’s proposed waterline for the City’s future connection point.

end

 

PURPOSE

 

The City of Farmersville is currently expanding Farmersville Parkway. Installation of the casing at this time by the City’s contractor will result in cost savings to NTMWD and avoid future tunneling of the roadway. In consideration, NTMWD will install a stub-out and valves on the proposed waterline to facilitate a more efficient and cost-effective future connection for the City.

 

RECOMMENDATION

 

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an ILA as follows:

 

1)                     Authorize the Executive Director to execute an Interlocal Cooperation Agreement with the City of Farmersville, Texas.

 

2)                     Adopt Resolution No. 26-21 “A Resolution Authorizing the Executive Director to Execute an Interlocal Cooperation Agreement Between The North Texas Municipal Water District and The City Of Farmersville Regarding Modifications to NTMWD’S 48-inch Leonard Treated Water Pipeline to Farmersville Delivery Point Waterline”.

 

Contracting Party:

City of Farmersville

 

 

Purpose: 

Execution of Interlocal Cooperation Agreement

 

 

Project:

No. 101-0632-23, Leonard Treated Water Pipeline to Farmersville Delivery Point

 

 

Amount:

N/A

 

 

Committee:

This will be a Champion Update at the May 27, 2026, Water Committee meeting

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

3.3 Durable Strategic Partnerships

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

BACKGROUND

 

In June 2025, the Farmersville City Council authorized a project to improve and expand Farmersville Parkway. In November 2025, Farmersville staff contacted NTMWD regarding the roadway expansion, NTMWD’s future waterline, and Farmersville’s future delivery point.

 

This coordination supports both local and regional infrastructure improvements and demonstrates continued collaboration between NTMWD and local municipalities.

 

INTERLOCAL COOPERATION AGREEMENT

 

The Interlocal Cooperation Agreement (ILA) is attached. General notable terms are as follows:

 

                     The City of Farmersville’s contractor will install approximately 100 linear feet of 68-inch (minimum inside diameter) steel casing for NTMWD’s future waterline between stations 611+34 and 612+31. The casing will be installed within City-owned Farmersville Parkway right-of-way per approved construction plans and specifications dated December 15, 2025.

                     NTMWD shall install a stub-out and valves on NTMWD’s future waterline at station 349+04 for the future connection of a waterline to deliver potable water to the City’s Project. The stub-out and valves will be installed within NTMWD’s 60-foot waterline easement per approved construction plans and specifications dated April 14, 2026.

 

The Farmersville City Council approved this agreement and authorized execution on May 4, 2026.

 

FUNDING

 