Legislation Details

File #: 26C-29    Version: 1
Type: Consent Agenda Item Status: Agenda Ready
File created: 6/12/2026 In control: Board of Directors
On agenda: 6/25/2026 Final action:
Title: Conveyance System SCADA Improvements; Project No. 507-0688-26; Engineering Services Agreement - Preliminary Engineering
Indexes: .RWWS, .RWWS - Lower East Fork RWRRF, .Small Systems-305-S. Rockwall (Buffalo Crk) WWTP, .UEFIS - Upper East Fork Interceptor System, Engineering Services Agreement - Preliminary Engineering Design
Code sections: 507-0688-26 - Conveyance System SCADA Improvements
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Regional Wastewater System, Upper East Fork Interceptor System, Buffalo Creek Interceptor System, Lower East Fork Interceptor System, and Forney Interceptor System

 

title

Conveyance System SCADA Improvements; Project No. 507-0688-26; Engineering Services Agreement - Preliminary Engineering

end

 

SUBJECT

 

recommendation

Authorize funding in the amount of $158,448 to Gupta and Associates, Inc. for an engineering services agreement for preliminary design development of the proposed Conveyance System Supervisory Control and Data Acquisition (SCADA) Improvements project.

end

 

PURPOSE

 

The purpose of this project is to enhance service reliability and operational efficiency across wastewater conveyance systems by developing recommendations for the SCADA network, including redundant communications for centralized monitoring and control of lift stations at the Wilson Creek and South Mesquite Creek Regional Wastewater Treatment Plants.

 

RECOMMENDATION

 

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:

 

Consultant:

Gupta and Associates, Inc.

 

 

Scope: 

Preliminary Engineering

 

 

Project:

No. 507-0688-26, Conveyance System SCADA Improvements

 

 

Amount:

$158,448

 

 

Committee:

This item was discussed at the May 27, 2026, Wastewater Committee meeting

 

 

 

 

 

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

1.1 High Quality Services                                                                                              1.4 Reliable and Resilient Systems

 

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

 

BACKGROUND

 

An alternate communication solution is recommended to back up the existing radio system for the lift stations located in the southern wastewater conveyance service area.  The lift stations in the southern wastewater service area experience a high number of alarms indicating miscommunication with the control room at the South Mesquite Creek Regional Wastewater Treatment Plant .  This project will provide recommendations for centralized monitoring of all lift stations at the Wilson Creek Regional Wastewater Treatment Plant, installation of a backup communication network and replacement of aging communication equipment at the following lift stations: Lower East Fork, Buffalo Creek, Forney Lift Station and Forney Mustang Creek.

 

The alternate communication system will be an extension of the system installed for the Upper East Fork Interceptor System (UEFIS) in 2018  Centralized monitoring of all lift stations in the UEFIS and southern conveyance systems at the Wilson Creek RWWTP is recommended.  The Wilson Creek RWWTP provides a manned control room 24 hours a day and 7 days a week, where the conveyance staff is based for operational efficiency and consistency of callouts.       

 

PROJECT PURPOSE

 

Provide a reliable and resilient overall communication system recommendation and implementation plan for all remote lift stations, including backup communications, for centralized monitoring and control at the Wilson Creek and South Mesquite Creek Regional Wastewater Treatment Plants.

 

PROJECT COMPONENTS

                     Preliminary design report including:

o                     Recommendations for monitoring and control of all lift stations at the Wilson Creek RWWTP

o                     Recommendations for monitoring only of Lower East Fork, Buffalo Creek, Forney Lift Station and Forney Mustang Creek lift stations at the South Mesquite Creek RWWTP

                     Conduct communication study to support recommendations to improve reliability of communication at remote lift station locations

                     Develop project summary sheets for future capital projects

                     Class 5 Association for the Advancement of Cost Engineering (AACE) cost estimates for each design option

 

 

BASIC SERVICES

                     Radio path studies for Upper East Fork Interceptor System (UEFIS) & lift stations in the southern wastewater service area

o                     Identify sites with low signal strength and provide recommendations for improvement

o                     Evaluate communication between South Mesquite Regional Wastewater RWWTP and Wilson Creek RWWTP

                     Evaluate current backup cellular communication and provide recommendations to expand backup communication to the southern wastewater service area lift stations

                     Determine modifications needed for Human Machine Interface (HMI)

                     Preliminary design report

 

SPECIAL SERVICES

                     Physical radio communication testing

 

CONSULTANT SELECTION PROCESS

 

                     A total of three engineering firms, were interviewed and Gupta and Associates Inc. was deemed the most highly qualified firm for this project.

 

ENGINEERING SERVICES FEE

 

Description

Amount

Basic Services

$148,448

Special Services

$10,000

Requested Amount

$158,448

 

FUNDING

 

Funding in the amount of $158,448 to Gupta and Associates, Inc. is to be made available utilizing $31,690 from the Regional Wastewater System Construction Funds, $31,690 from the Upper East Fork Interceptor System Construction Funds, $31,690 from the Buffalo Creek Wastewater Interceptor System Construction Funds, $31,690 from the Lower East Fork Wastewater Interceptor System Construction Funds and $31,688 from the Mustang Creek Wastewater Interceptor System Construction Funds.