Title: Leonard Water Treatment Plant (WTP) - South 25kV Overhead Electrical Loop; Project No. 101-0669-25; Engineering Services Agreement - Final Engineering
Sponsors: Water Committee - Committee Action
Indexes: .RWS - Leonard Water Treatment Plant, .RWS - Regional Water System, Engineering Services Agreement - Final Engineering
Code sections: 101-0669-25 - Leonard WTP – South 25kV Overhead Electrical Loop
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Regional Water System

 

title

Leonard Water Treatment Plant (WTP) - South 25kV Overhead Electrical Loop; Project No. 101-0669-25; Engineering Services Agreement - Final Engineering

 

end

SUBJECT

 

recommendation

Authorize funding in the amount not-to-exceed $388,300 to Fannin County Electric Cooperative (FCEC) for final engineering services associated with providing electric power service to the Leonard Water Treatment Plant (Leonard WTP) southside for future expansions; and Leonard WTP High Service Pump Station-South.  

end

PURPOSE

 

The purpose of this project is to expand the electrical service to accommodate the expansion of the Leonard WTP to its ultimate 280 MGD capacity. FCEC will design the expansion of the existing electrical substation at Leonard WTP, which transforms the 138-kilovolt transmission voltage to a 25-kilovolt distribution voltage.

RECOMMENDATION

 

The Executive Director and NTMWD staff recommend the Board of Directors to authorize the Executive Director to execute a final engineering agreement as follows: 

 

 

Electric Service:

Fannin County Electric Cooperative (FCEC)

 

 

Scope:

Final engineering services agreement

 

 

Project:

No. 101-0669-25, Leonard WTP - South 25kV Overhead Electric Loop  

 

 

Amount:

$388,300

 

 

Committee:

This will be a Champion Update at the June 25, 2025, Water Committee meeting

 

 

 

 

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

1.2 Successfully Deliver Capital Program 1.4 Reliable and Resilient Systems

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

BACKGROUND

 

The Leonard WTP has an ultimate planned capacity of 280 MGD. Projected demand growth in the District's service area  requires Leonard WTP to have a treatment capacity of 210 MGD no later 2030.

 

FCEC will design the expansion of the existing electrical substation at Leonard WTP, which transforms the 138-kilovolt transmission voltage to a 25-kilovolt distribution voltage.  Substation will be equipped with transformers and required equipment to serve the new south power loop.

 

PROJECT PURPOSE

                     FCEC will provide an electrical service of 25 kilovolts (kV) to the Leonard Water Treatment Plant (WTP) south parcel for future expansions.

 

PROJECT COMPONENTS

                     The scope of the agreement with FCEC includes the following preconstruction engineering services:

 

1)                     Design two overhead circuits and expand the substation to provide permanent power needs to the Leonard Water Treatment Plant south parcel and the High Service Pump Station South. The permanent power system is designed to carry the ultimate load required by the plant at the buildout capacity of 280 MGD.

 

o                     Control Enclosure - drawings of existing components will be modified where necessary to support the transformer, circuit switcher, and circuit breaker additions. A new relay panel will be required for the new transformer and circuit switcher.

 

o                     AC/DC Power System - Modification to AC and DC panel schedules as necessary for the proposed equipment additions.

 

o                     Relay Panels - elevations, wiring diagrams, and details for the new relay panels and relay panel modifications as necessary will be prepared.

 

 

 

o                     Transformer Drawings - provide connection diagrams for new circuits and current transformer (CT) connections.

 

o                     Distribution Feeders - Plans and details for the interconnection of two new overhead distribution feeders will be provided.

 

o                     Circuit Schedule - drawings showing circuits and circuit routing as necessary for the proposed equipment additions will be provided.

 

o                     Grounding - Grounding improvements will be limited to the connection of new equipment to the existing ground grid.

 

2)                     Development of cost estimates and timelines for the following:

 

o                     The construction of electrical facilities, including transformer connections and distribution lines to provide service to NTMWD facilities.

o                     Construction of the electrical facilities will be presented to the Board of Directors at a future date.

 

3)                     Upon completion, FCEC and NTMWD will conduct final accounting of all project costs and all unused funds will be returned to NTMWD. Similarly, if the actual cost is higher than the estimated cost advanced to FCEC by NTMWD, FCEC will issue an invoice to NTMWD for the unpaid actual cost following a change order action.

  

ENGINEERING SERVICES FEE

 

DESCRIPTION                     COST

Final engineering design services                     $388,300

Total                     $388,300

 

FUNDING

 

Funding in the amount of $388,300 to Fannin County Electric Cooperative is to be made available in the Regional Water System Capital Improvement Fund.