File #: 24-6061    Version: 1
Type: Administrative Memorandum Status: Agenda Ready
File created: 9/6/2024 In control: Board of Directors
On agenda: 9/26/2024 Final action:
Title: Forney Mustang Creek Lift Station Phase II & Forney Mustang Creek Parallel Force Main; Project No. 509-0561-20; Tabulation of Bids and Award of Contract and Inspection Services
Sponsors: Wastewater Committee - Committee Action
Indexes: .Inter Sys - Mustang Cr Interceptor, Internal Inspection Services, Tabulation of Bids - Award of Contract and Inspection Services
Code sections: 509-0561-20 - Forney Mustang Ck Lift Station, Phase 2 and Forney Force Main Imp
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Mustang Creek Interceptor System

 

title

Forney Mustang Creek Lift Station Phase II & Forney Mustang Creek Parallel Force Main; Project No. 509-0561-20; Tabulation of Bids and Award of Contract and Inspection Services

end

 

 

SUBJECT

 

recommendation

Award a construction contract with McKee Utility Contractors, LLC  in the amount of $20,084,624 and authorizing internal inspection services in the amount of $836,220 for the Forney Mustang Creek Lift Station Phase II & Forney Mustang Creek Parallel Force Main project.

end

 

 

PURPOSE

 

The existing 24-inch force main is limiting the capacity of Forney Mustang Creek Lift Station to 12 million gallons per day (MGD). A new force main and expansion of the lift station to 30 MGD are needed to meet the growth projections of the City of Forney.

 

 

RECOMMENDATION

 

The Executive Director, NTMWD staff and Hazen and Sawyer recommend the Board of Directors authorize the award of a contract as follows:

 

Contractor:

McKee Utility Contractors, LLC

 

 

Scope:

Construction

 

 

Project:

No. 509-0561-20, Forney Mustang Creek Lift Station Phase II & Forney Mustang Creek Parallel Force Main

 

 

Amount:

Construction Contract:  $20,084,624  

 

Inspection Services (Internal): $836,220

 

 

Committee:

This will be an item on the September 25, 2024, Wastewater Committee meeting agenda

 

 

 

DRIVER(S) FOR THIS PROJECT

 

Strategic Objective:

1.2 Successfully Deliver Capital Program                          1.4 Reliable and Resilient System

 

Regulatory Compliance

Asset Condition

Capacity

Redundancy/Resiliency

Relocation or External Requests

Operational Efficiency

Safety

Administrative

Policy

Other _____________

 

 

BACKGROUND

 

PROJECT PURPOSE 

 

                     The Forney Mustang Lift Station’s firm capacity is limited to 12 MGD due to the size of the existing discharge force main that conveys flow to the South Mesquite Regional Wastewater Treatment Plant (RWWTP).

                     The City of Forney has requested to increase the capacity of the Forney Mustang Lift Station to 30 MGD to meet projected flows beyond 2030 due to growth in their service area.

                     A new force main from the Forney Mustang Creek Lift Station to the Buffalo Creek Lift Station is necessary to increase conveyance capacity in the Forney Mustang Creek System to 30 MGD.

                     The Buffalo Creek Parallel Force Main project, currently in design as NTMWD Project No. 507-0640-24, is evaluating options to convey flow from the Buffalo Creek Lift Station to the South Mesquite RWWTP. 

 

PROJECT COMPONENTS

 

                     Install approximately 16,150 linear feet of 42-inch force main pipeline including all associated valves, fittings, odor control systems and other appurtenances. 

                     Install two additional pumps including all associated mechanical, electrical, heating, ventilating, and air conditioning (HVAC), and site improvements at the Forney Mustang Creek Lift Station.

 

 

 

 

 

 

TABULATION OF BIDS

 

Sealed bids for construction of this project were received at 2:00 p.m. on Wednesday, August 7, 2024, as tabulated below:

 

Bidder                                                                                                          Total Bid                                           Recommendation

 

McKee Utility Contractors, LLC                                           $20,084,624                                           Lowest responsible bid

Recommended for Award

Mountain Cascade of Texas, LLC                      $20,185,166

Belt Construction of Texas, LLC                                           $23,799,366                     

Thalle Construction Company, Inc.                      $27,625,088                      

S.J. Louis Construction of Texas, Ltd.                      $32,386,929.60

 

ENGINEER’S OPINION OF                                           $22,934,817

PROBABLE COST

 

 

LOWEST RESPONSIBLE BIDDER HISTORY

McKee Utility Contractors, LLC has successfully completed several similar projects for the NTMWD:

 

                     Project No. 501-0466-17, Rowlett Creek Parallel Trunk Sewer Extension (completed December 2019)

                     Project No. 101-0462-17, Renner Road to Plano Delivery Point No. 2 Pipeline (completed July 2022)

                     Project No. 101-0490-18, Wylie-Rockwall-Farmersville 36”/48” Pipeline Improvements Phase II (completed June 2023)

                     Project No. 501-0504-18, North McKinney Parallel Interceptor (2024)

                     Project No. 101-0544-19, Upper East Fork Interceptor System Relocation of 60” Wastewater Pipeline (2024)

 

Based on their standing as lowest responsible bidder, the information provided, and reports by the supplied references, the NTMWD staff and Hazen and Sawyer recommend award of the contract to McKee Utility Contractors, LLC.

 

INTERNAL INSPECTION SERVICES

 

NTMWD will utilize its own inspection staff to cover all inspection tasks.  The costs to the NTMWD related to this internal inspection coverage is approximately $836,220.

 

FUNDING

 

Funding in the amount of $20,084,624 to McKee Utility Contractors and $836,220 for NTMWD internal inspection services is to be made available from the Forney Mustang Creek Interceptor System Construction Funds.