Skip to main content
NTMWD Logo
File #: 24C-21    Version: 1
Type: Consent Agenda Item Status: Agenda Ready
File created: 5/6/2024 In control: Board of Directors
On agenda: 5/23/2024 Final action:
Title: Request to Declare Certain NTMWD Property Salvage or Surplus and Authorization to Enter into a Contract to Facilitate the Trade of Such Assets; Bois d'Arc Lake Boat Ramps; Project No. 101-0436-16
Sponsors: Water - NC
Indexes: .RWS - Bois d'Arc Lake
Code sections: 101-0436-16 - LBCR Reservoir Boat Ramps
Related files: 25C-33, 25C-6, 24C-26
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Regional Water System

title
Request to Declare Certain NTMWD Property Salvage or Surplus and Authorization to Enter into a Contract to Facilitate the Trade of Such Assets;
Bois d'Arc Lake Boat Ramps; Project No. 101-0436-16
end


SUBJECT

recommendation
Declare certain NTMWD property salvage or surplus and authorize the Executive Director or their designee to enter into a contract to facilitate the trade of such assets for new equipment.
end


PURPOSE

Request the Board of Directors declare the John Deere 1590 No-Till-Drill (Asset No. 1658) salvage or surplus in order to replace the asset with new equipment.


RECOMMENDATION

The Executive Director and NTMWD staff recommend the Board of Directors declare the asset listed below as salvage or surplus and authorize the Executive Director or their designee to enter into a contract with United Ag & Turf for the trade of such assets for new operational equipment as follows:

Vendor:

United Ag & Turf


Scope:

Trade of NTMWD Property Declared Salvage or Surplus


Project:

Bois d'Arc Lake Boat Ramps, Procurement of Equipment for Bois d'Arc Lake Operations; Project No. 101-0436-16


Amount:

$40,000 Trade-In Credit (Asset No. 1658)


Strategic Objective:
1.4 Reliant and Resilient Systems



Committee:
N/A



DRIVER(S) FOR THIS PROJECT

? Regulatory Compliance
? Asset Condition
? Capacity
? Redundancy/Resiliency
? Relocation or External Requests
? Operational Efficiency
? Safety
? Administrative
? Policy
? Other _____________


BACKGROUND

* Maintaining vegetative cover on the Bois d'Arc Lake dam is critical to helping prevent erosion and maintain the embankment.
* Vegetative maintenance on the embankment requires periodic reseeding to ensure healthy, consistent vegetative cover.
* The No-Till Drill originally acquired is not conducive to the type of seed used to establish vegetation during the construction of the Bois d'Arc Lake dam and is difficult to operate on steep slopes.
* Declaring this item salvage or s...