Legislation Details

File #: 26-6306    Version: 1
Type: Administrative Memorandum Status: Agenda Ready
File created: 10/7/2026 In control: Board of Directors
On agenda: 10/22/2026 Final action:
Title: Pipeline Relocations at US 380, FM 1641, and FM 741; Project No. 101-0619-22, Work Package A; Tabulation of Bids and Award Of Contract, Engineering Services Agreement, and Authorize Inspection Services
Indexes: .RWS - Regional Water System, Engineering Services Agreement, Tabulation of Bids - Award of Contract and Authorize Inspection Services, Tabulation of Bids and Award of Contract
Code sections: 101-0619-22 - Pipeline Relocation at US 380, FM 1641 and FM 741
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Regional Water System


title
Pipeline Relocations at US 380, FM 1641, and FM 741; Project No. 101-0619-22, Work Package A; Tabulation of Bids and Award Of Contract, Engineering Services Agreement, and Authorize Inspection Services

end
SUBJECT

recommendation
Authorize award of a construction contract for the Pipeline Relocations at US 380, FM 1641, and FM 741, Work Package A project in the amount of $ 14,312,129.94 to J&L Construction, LLC, authorize additional engineering services with Halff Associates, Inc. in the amount of $702,440 for construction phase engineering services, and authorize internal inspection services in the amount of $720,300.

end
PURPOSE

The Texas Department of Transportation (TxDOT) is preparing to widen Farm-to- Market Roads 1641 (FM 1641) and 741 (FM 741). Project limits for FM 1641 are from FM 548 to FM 148. Project limits for FM 741 are from US 175 to Sunnybrook Drive. These TxDOT projects will encroach on existing NTMWD water lines and easements, requiring the relocation or protection of water lines, valves, and other facilities to alleviate conflict with the roadway expansion.

This construction contract, Work Package A, is for construction of the required relocations and protections of NTMWD pipelines along and crossing FM 1641 and FM 741. A separate work package for NTMWD pipeline relocations at US 380 will be awarded at a future date.

RECOMMENDATION

The Executive Director and NTMWD staff recommend the Board of Directors authorize the award of a contract as follows:

Contractor: J&L Construction, LLC

Consultant:

Halff Associates, Inc.



Scope:
Construction Contract, Construction Phase Engineering Services, and Internal Inspection Services

Project:
No. 101-0619-22, Pipeline Relocations at US 380, FM 1641, and FM 741, Work Package A
Amount:
Construction Contract: $ 14,312,129.94
Additional Engineering Services: $702,440
Internal Inspection Services: $720,300 Committee: This w...