File #: 24C-38    Version: 1
Type: Consent Agenda Item Status: Agenda Ready
File created: 9/11/2024 In control: Board of Directors
On agenda: 9/26/2024 Final action:
Title: Waterline Relocations Along State Highways in Dallas, Rockwall, and Kaufman Counties; Project No. 101-0607-22, Work Package 607E; Tabulation of Bids and Award of Contract; and Authorize Inspection Services
Sponsors: Water Committee - Champion Update
Indexes: .RWS, Tabulation of Bids - Award of Contract and Authorize Inspection Services, Tabulation of Bids and Award of Contract
Code sections: 101-0607-22 - Waterline Relocations along State Highways
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Regional Water System

title
Waterline Relocations Along State Highways in Dallas, Rockwall, and Kaufman Counties; Project No. 101-0607-22, Work Package 607E; Tabulation of Bids and Award of Contract; and Authorize Inspection Services

end
SUBJECT

recommendation
Authorize award of a construction contract in the amount of $446,140 with JBM Excavation, LLC and internal inspection services in the amount of $94,500.
end

PURPOSE

This project is designed to address water quality issues in the area of the Transmission System where waters from the Wylie Water Treatment Plant (WTP) and the Tawakoni WTP come together and intermingle (mixing zone). This will be accomplished by adding isolation that can be remotely operated to control the direction of flow based on system demands. The location of the valves will fall within TxDOT right of way for US Hwy 80.

RECOMMENDATION

The Executive Director, NTMWD staff and Teague, Nall, and Perkins, Inc. (TNP) recommend the Board of Directors authorize the award of a contract as follows:

Contractor:
JBM Excavation, LLC


Scope:

Construction Contract and Internal Inspection Services


Project:

No. 101-0607-22, Waterline Relocations Along State Highways in Dallas, Rockwall, and Kaufman Counties; Work Package 607E - 24-inch and 42-inch Valve Automation Along US 80 Between Beltline Road and South Collins Road


Amount:

Construction Contract: $446,140
Internal Inspection Services: $94,500


Committee:
This item was a Champion Update at the May 22, 2024, Water Committee meeting





DRIVER(S) FOR THIS PROJECT

Strategic Objective:
1.1 - High Quality Services 1.4 - Reliable and Resilient Systems


? Regulatory Compliance
? Asset Condition
? Capacity
? Redundancy/Resiliency
? Relocation or External Requests
? Operational Efficiency
? Saf...