Regional Water System
title
Interlocal Cooperation Agreement between the North Texas Municipal Water District and the City of Farmersville regarding modifications to NTMWD's 48-inch Leonard Treated Water Pipeline to Farmersville Delivery Point Waterline; Project No. 101-0632-23; Resolution No. 26-21
end
SUBJECT
recommendation
Adopt Resolution No. 26-21 authorizing the execution of an Interlocal Cooperation Agreement (ILA) between the North Texas Municipal Water District and the City of Farmersville (City) to authorize the City's contractor to install 100 linear feet (LF) of 68-inch steel casing across Farmersville Parkway in exchange for a stub-out and valves on NTMWD's proposed waterline for the City's future connection point.
end
PURPOSE
The City of Farmersville is currently expanding Farmersville Parkway. Installation of the casing at this time by the City's contractor will result in cost savings to NTMWD and avoid future tunneling of the roadway. In consideration, NTMWD will install a stub-out and valves on the proposed waterline to facilitate a more efficient and cost-effective future connection for the City.
RECOMMENDATION
The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an ILA as follows:
1) Authorize the Executive Director to execute an Interlocal Cooperation Agreement with the City of Farmersville, Texas.
2) Adopt Resolution No. 26-21 "A Resolution Authorizing the Executive Director to Execute an Interlocal Cooperation Agreement Between The North Texas Municipal Water District and The City Of Farmersville Regarding Modifications to NTMWD'S 48-inch Leonard Treated Water Pipeline to Farmersville Delivery Point Waterline".
Contracting Party:
City of Farmersville
Purpose:
Execution of Interlocal Cooperation Agreement
Project:
No. 101-0632-23, Leonard Treated Water Pipeline to Farmersville Delivery Point
Amount:
N/A
Committee:
This will be a Champion Update at the...