File #: 25-6098    Version: 1
Type: Administrative Memorandum Status: Agenda Ready
File created: 1/10/2025 In control: Board of Directors
On agenda: 1/23/2025 Final action:
Title: Texoma Raw Water Pipeline No. 2; Project No. 101-0633-23; Engineering Services Agreement, Final Engineering
Sponsors: Water Committee - Committee Action
Indexes: .RWS - Regional Water System, Engineering Services Agreement - Final Engineering
Code sections: 101-0633-23 - Texoma Raw Water Pipeline No 2
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Regional Water System


title
Texoma Raw Water Pipeline No. 2; Project No. 101-0633-23; Engineering Services Agreement, Final Engineering

end
SUBJECT

recommendation
Authorize funding in the amount of $13,870,650 for a final Engineering Services Agreement with Black & Veatch Corporation for final design of the proposed Texoma Raw Water Pipeline No. 2.

end
PURPOSE

The Texoma Raw Water Pipeline No. 2 will parallel the existing Texoma Raw Water Pipeline and provide additional capacity to NTMWD's water transmission system from the Lake Texoma Pump Station to the water treatment facilities in Wylie and Leonard. The Texoma Raw Water Pipeline No. 2 will also allow for operational flexibility in continuity of service during the period when NTMWD staff is performing assessment and/or maintenance to extend the life of the existing Texoma Raw Water pipeline.

RECOMMENDATION

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:


Consultant:

Black & Veatch Corporation



Scope:

Final engineering design


Project:

101-0633-23, Texoma Raw Water Pipeline No. 2



Amount:

$13,870,650


Committee:
This will be an item on the January 22, 2025, Water Committee meeting agenda






DRIVER(S) FOR THIS PROJECT

Strategic Objective:
1.1 High Quality Services 1.4 Reliable and Resilient Systems



? Regulatory Compliance
? Asset Condition
? Capacity
? Redundancy/Resiliency
? Relocation or External Requests
? Operational Efficiency
? Safety
? Administrative
? Policy
? Other _____________

BACKGROUND

Since 1992, NTMWD has been conveying water from Lake Texoma through the 72-inch Texoma Raw Water Pipeline for eventual treatment at the NTMWD Wylie Water Treatment Plant. The 2021 "Lake Texoma Pump Station Updated Improvements Plan" and the 2022 "NTMWD Raw Water Supply Operati...

Click here for full text