File #: 24-6013    Version: 1
Type: Administrative Memorandum Status: Agenda Ready
File created: 4/12/2024 In control: Board of Directors
On agenda: 4/25/2024 Final action:
Title: Wylie Water Treatment Plant Raw Water Pump Station No. 3 Improvements; Engineering Services Agreement; Project No. 101-0649-24
Sponsors: Water Committee - Committee Action
Indexes: .RWS, Engineering Services Agreement
Code sections: 101-0649-24 - Wylie WTP Raw Water Pump Station No. 3 Improvements
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Regional Water System

title
Wylie Water Treatment Plant Raw Water Pump Station No. 3 Improvements; Engineering Services Agreement; Project No. 101-0649-24
end

SUBJECT

recommendation
Authorize funding for an engineering services agreement for design of the Wylie Water Treatment Plant (WTP) Raw Water Pump Station No. 3 Improvements project.
end

PURPOSE

The proposed improvements will replace aging infrastructure and upgrade certain systems to current NTMWD's standards. Condition-related improvements are needed to maintain a high level of service for the largest raw water pump station at the Wyle WTP. Replacement of some electrical and control equipment that have reached their service life or have increased risk of failure will improve reliability of the pump station.

RECOMMENDATION

The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:

Consultant:

AECOM Technical Services, Inc.


Scope:

Final Engineering Design


Project:

No. 101-0649-24, Wylie Water Treatment Plant Raw Water Pump Station No. 3 Improvements


Amount:

$871,877


Strategic Objective:
1.2: Successfully Deliver Capital Program 1.4: Reliable and
Resilient Systems



Committee:
This will be an item on the April 24, 2024, Water Committee meeting agenda




DRIVER(S) FOR THIS PROJECT

? Regulatory Compliance
? Asset Condition
? Capacity
? Redundancy/Resiliency
? Relocation or External Requests
? Operational Efficiency
? Safety
? Administrative
? Policy
? Other _____________

BACKGROUND

Lavon Raw Water Pump Station No. 3 (RWPS No. 3) is the largest of the District's raw water pump stations at Lake Lavon and is an integral component of the movement of raw water supply system from Lake Lavon into the Wylie plants. The improvements are recommended in order to replace aging infrastructure and provide critical upgrades to certain systems.

PROJECT PURPOSE
* Maintain the use...